博文

目前显示的是标签为“mud transfer pump”的博文

How Is a Drilling Centrifugal Pump Tested Before Delivery?

图片
 Before a drilling centrifugal pump is shipped, the complete assembly is run at the factory and checked under operating conditions. Flow, outlet pressure, vibration and temperature are among the main parameters monitored during the test. For a pump used in drilling fluid transfer, these checks show how the assembled pump performs before installation. They also give the buyer a reference for comparing the pump with the required operating conditions of the mud circulation system. The testing process is straightforward, but the results need to be read in the right context. Flow alone, for example, does not show whether a pump will meet the requirements of a complete mud circuit. Pressure, running condition and equipment configuration matter as well. Why Factory Testing Matters for a Drilling Centrifugal Pump Running the complete assembly at the workshop gives engineers a chance to check the pump before it reaches the jobsite. The pump is operated at its specified test point while its ...